Crawler Crane Calamity at Cement Plant
Leave a CommentA production building was being constructed at a cement plant. A large crawler crane was being used to install the pre-assembled metal wall framing of the building. The weights and lift radii of the four wall framing sections, along with the rigging spreader and other lift equipment, were within the rated capacity of the crane. (more…)